We have an ETL pipeline that runs for each CSV uploaded into an storage account (Azure). It runs some transformations on the CSV and writes the outputs to another location, also as CSV, and calls a stored procedure on the database (SQL Azure) which ingests (BULK INSERT) this resulting CSV into a staging table.
This pipeline can have concurrent executions as multiple resources can be uploading files to the storage. Hence, the staging table is getting data inserted pretty often.
Then, we have an scheduled SQL job (Elastic Job) that triggers an SP that moves the data from the staging table into the final table. At this point, we would want to truncate/empty the staging table so that we do not re-insert them in the next execution of the job.
Problem is, we cannot be sure that between the load from the staging table to the final table and the truncate command, there has not been any new data written into the staging table that could be truncated without first being inserted in to the final table.
Is there a way to lock the staging table while we're copying the data into the final table so that the SP (called from the ETL pipeline) trying to write to it will just wait until the lock is release? Is this achievable by using transactions or maybe some manual lock commands?
If not, what's the best approach to handle this?
I would propose solution with two identical staging tables. Lets name them StageLoading and StageProcessing.
Load process would have following steps:
1. At the beginning both tables are empty.
2. We load some data into StageLoading table (I assume each load is a transaction).
3. When Elastic job starts it will do:
- ALTER TABLE SWITCH to move all data from StageLoading to StageProcessing. It will make StageLoading empty and ready for next loads. It is a metadata operation, so takes miliseconds and it is fully blocking, so will be done between loads.
- load the data from StageProcessing to final tables.
- truncate table StageProcessing.
4. Now we are ready for next Elastic job.
If we try to do SWITCH when StageProcessing is not empty, ALTER will fail and it will mean that last load process failed.