Migration of projects along with history and dependencies from PTC integrity 11.0 to 11.2 version

129 Views Asked by At

I have several projects in PTC integrity 11.0 that I am currently using. I have to migrate all the projects from 11.0 to 11.2 with out losing the traceability, revision history, item relationship or project level ACL's and triggers. Please advise if there is any way to carry out this type of migration.

2

There are 2 best solutions below

2
David G On

Upgrading from 11.0 to 11.2 will not lose any data.

Obviously you should make sure you have a solid backup, just in case something bad happens.

0
Swapnil G Thaware On

There is no direct way to get SI projects along with its history and versions and if you are talking about IM projects then history and all cant be migrated.

So if you want to migrate history and versions of SI projects then you need to raise PTC Integrity ticket and provide below three files from the directory of the project that is being migrated:

enter image description here