1

There are 1 best solutions below

0
Swathi Ravi On

After the thorough investigation, according to current Scheduler architecture it is not feasible to render the length scale on the x-axis instead of dates. Because of the scheduler is primarily designed to function with the hours and dates. As a result, it is not possible to remove the dates and replace them with a length scale in the Scheduler as per your request.